Australia - Required by 31 month deadline

Required by the 31 month deadline to enter the national phase in Australia under the PCT

  • PCT or international publication number
  • If the PCT application is not in English, an English translation of the specification as amended under Articles 19 and/or 34 along with a verification certificate from the translator. Download Verification of Translation form.

To follow

  • Formal drawings (within 2 months from the filing date).  If formal drawings are not lodged by this date, the application will lapse.